Using a complete scientific top quality management program, great high-quality and fantastic religion, we win great track record and occupied this area for Aluzinc Coil , G300 Gi Steel Coil , Armour Wire , We are also the appointed OEM factory for several worlds' famous products brands. Welcome to contact us for further negotiation and cooperation.
High reputation Original material - High Quality Building Binding Wire 0.80mm – TIANJIN MEIJIAHUA Detail:

Product Name Binding Wire Surface Electro galvanized or black annealed
Brand MJH Tensile strenth 350-550Mpa
Diameter 0.80mm Package 25-50kg per coil or by spool
Tolerence +/-0.01mm Place of origin Mainland China

Annealed Wire

High Quality Building Binding Wire features.

1. Complete product specifications and various materials.
2. High dimensional accuracy, up to ±0.01mm.
3. Excellent surface quality, good brightness.
4. Strong corrosion resistance, high tensile strength.
5. Stable chemical composition, pure steel, low inclusions.
6. Good packaging and favorable price.
7. Can be customized for non-standard.

Specification Complete Surface treatment Bright line
Whether customizable Yes Surface Glossy, matte
Cross-sectional shape Round Structure Single
Application range Steel tying, household appliances, metal products, automotive, rail transportation, construction decoration Features High hardness, high load-bearing capacity

High Tensile Strength Wire

Binding wire for reinforcement tying method.

1. beam column (wall) rebar placement order, when the beam and column or wall side level, beam that side of the main reinforcement placed within the column or wall vertical longitudinal reinforcement.

2. Frame structure, primary and secondary beam reinforcement placement order. In frame structure, the upper and lower reinforcement of secondary beam is placed above the upper and lower reinforcement of main beam, and the upper and lower reinforcement of frame connecting beam is placed above the upper and lower reinforcement of main frame beam.

3. The order of placing the main and secondary beam reinforcement of the foundation reinforcement. Foundation reinforcement, secondary beam upper main reinforcement is placed under the main beam upper main reinforcement, slab reinforcement upper reinforcement is placed under the foundation beam upper main reinforcement.

4. Bottom plate (top plate) rebar placement order. When the two directions of reinforcement cross, the base slab and floor short span direction upper reinforcement should be placed above the long span direction main reinforcement, short span direction lower reinforcement placed under the long span direction main reinforcement.

5. Three points tying within the lap. Each reinforcement in the lap length must be tied with three points. Tie the lap reinforcement with double wire at 30mm from both ends, tie one in the middle, and over three vertical bars.

6. Pass three bars within the lap. The wall vertical reinforcement lap range must ensure that there are three horizontal bars passing through, and the wall horizontal reinforcement lap range must ensure that there are three vertical bars passing through.

7. Staggered lap of horizontal reinforcement of shear wall. Wall horizontal reinforcement lap joints staggered spacing should be ≥ 500mm, the same member of adjacent longitudinal reinforcement tied lap joints should be staggered by 50%.

8. Shear wall vertical tendon joints staggered. Shear wall in the same row of two adjacent vertical tendon joints should be staggered, different rows of two adjacent vertical tendon joints should also be staggered. Note that the length of the lap joint should meet 1.2laE in addition to the lap joint, and should also meet the lap range through the three horizontal bars.

9. Hoop reinforcement installation. The main reinforcement must be in close contact at the hoop bend. The lap part shall be made with double main reinforcement hoops, and the hoop bend hooks shall hook all the two main reinforcement bars.

10. Positioning hoop frame. Positioning hoop frame is set at the top of the frame column template to control the displacement of the reinforcement, and the positioning hoop is divided into two types: internal control type and external control type.

Precautions.

The method is different for different parts.

 

 


Product detail pictures:

High reputation Original material - High Quality Building Binding Wire 0.80mm – TIANJIN MEIJIAHUA detail pictures

High reputation Original material - High Quality Building Binding Wire 0.80mm – TIANJIN MEIJIAHUA detail pictures

High reputation Original material - High Quality Building Binding Wire 0.80mm – TIANJIN MEIJIAHUA detail pictures


Related Product Guide:

owing to fantastic assistance, a variety of high quality goods, aggressive rates and efficient delivery, we love a very good popularity among our customers. We are an energetic firm with wide market for High reputation Original material - High Quality Building Binding Wire 0.80mm – TIANJIN MEIJIAHUA , The product will supply to all over the world, such as: Liberia, Florence, Canada, Nowadays our merchandise sell all over the domestic and abroad thanks for the regular and new customers support. We supply high quality product and competitive price, welcome the regular and new customers cooperate with us!
  • High Quality, High Efficiency, Creative and Integrity, worth having long-term cooperation! Looking forward to the future cooperation!
    5 Stars By Lydia from Chicago - 2017.03.28 12:22
    The manufacturer gave us a big discount under the premise of ensuring the quality of products, thank you very much, we will select this company again.
    5 Stars By Gloria from Atlanta - 2017.06.16 18:23
    Write your message here and send it to us